NASA reveals new timeline for Artemis 3 mission and 14-day flight plan

Published October 23, 2026 10:28 AM EDT

NASA engineers on the Space Coast are preparing NASA’s SLS rocket inside the Vehicle Assembly Building as officials set a target launch date and 14-day mission timeline for the Artemis 3 test flight as early as summer 2027.Artemis 3 flight timeline

What we know:

NASA aims to launch its next moon mission, Artemis 3, as early as summer 2027 for a 14-day flight, officials said on Friday. The mission centers on testing two separate lunar landers built by Blue Origin and SpaceX, which will launch within days of each other.

The Space Launch System rocket boosters are stacked and ready inside the Vehicle Assembly Building. Under the new flight plan, Blue Origin will launch its lander first, followed by the SLS rocket carrying the Orion capsule and crew into low Earth orbit. Orion will link up with Blue Origin's lander first, before the SpaceX Starship launches about six days later to meet the crew and capsule. After Orion links up with Starship, the Orion capsule will come back to earth.

Moon landing schedule targets

Officials have not yet confirmed the exact month for the anticipated launch. Officials have also not yet specified how any scheduling delays and setbacks will be addressed or time made up before the anticipated summer liftoff. If the orbital test flight succeeds, NASA is targeting two moon missions in 2028, with one planned to put astronauts on the lunar surface for the first time in over five decades.

Spacecraft troubleshooting strategy shift

Why you should care:

NASA management is changing how its workforce handles technical setbacks, directing employees to take immediate hands-on roles instead of waiting for external contractors. NASA engineers recently resolved hydrogen leak issues after bringing the repair work in-house, setting a standard for future technical operations.

"We’re fighting daily to increase the pace and value of our missions," said Jeremy Parsons, NASA Artemis Program manager. "We’re strengthening the spaceflight workforce. We’re rebuilding key competencies, and we’re onboarding the core talent we need in order to achieve these goals."

"Confronting our shortcomings and doing something about them is how confidence is earned, it's how cultures are changed and it’s how the might of a great space agency is once again unleashed," said NASA Administrator Jared Isaacman.

How to watch the news conference

NASA streamed the news conference on its social media channels, including YouTube.

What is the Artemis moon program?

The Artemis program is part of NASA's goal to return American astronauts to the moon's surface for the first time in more than 50 years.

The last time a human stepped onto the moon was during the Apollo program, which ended in 1972.

NASA is currently making preparations for the Artemis III mission in 2027. The mission will send four astronauts to Earth orbit in an Orion spacecraft where they will test rendezvous and docking systems needed for lunar landings.

Artemis III crew:

The Artemis III crew includes NASA's Randy Bresnik (Commander), ESA's Luca Parmitano (Pilot), NASA's Andre Douglas (Mission Specialist), and NASA's Frank Rubio (Mission Specialist).

Following the Artemis III mission, NASA will launch the Artemis IV mission, which will involve astronauts landing near the moon's south pole in 2028.

The Source: This story was written based on information released by NASA and from previous FOX 35 reporting. 

SpaceNASABrevard County News