Grass installation begins at Orlando City soccer stadium

- Construction at Orlando City SC’s new soccer stadium in downtown Orlando continues moving forward as the Club prepares for the launch of the Lions’ third campaign in Major League Soccer (MLS) in March 2017, followed by the second campaigns for the Pride in the National Women's Soccer League (NWSL) and Orlando City B of the United Soccer League (USL).

Nearly 2.2 acres of grass are being relocated from Quality Turf Farms in Avon Park, Fla. to the new stadium with up to seven truck-loads of grass being moved throughout a three-day process.

Up Next:


  • Popular

  • Recent

Stories You May Be Interested In – includes Advertiser Stories